Some Experiences on Seal Management


Some Experiences on Seal Management

There is no trivial matter in seal management. The seal has important legal value. The company seal is the symbol of the company's main identity, the symbol of the company's power, and the symbol of the company's interests. The seal management of regional companies seems to be a small matter, but it is really a big thing. Some people will say that it is just a matter of sealing several chapters. It is too complicated to require this process and that review, which is to help the printing unit prevent problems before they occur. I have been in the company for more than half a year, and combined with my previous work experience, I have talked about some superficial experience in seal management.

First, abide by the working principles

The opposite of each stamped document is our owner, or the competent authority, or the partner. A contract and a document not only reflect the company's confirmation of the content, but also show the company's image. Therefore, we should try to avoid the "almost" phenomenon, and the seal staff should adhere to the accuracy of the writing, review, and seal application, and develop the working habit of "thinking - arrangement - inspection - improvement". Adhere to the principle of standardization and accuracy in the work. Every link and every process should be meticulous, and there should be no slightest carelessness. Different documents should be sealed with different standards, and every sealed seal should be "zero error, zero error". This is the most basic requirement of work quality. At the same time, we should adhere to the principle of security and confidentiality. Security and confidentiality are inherent requirements of the political nature of work. The handling personnel shall focus on learning laws and regulations, abide by various systems, strictly work procedures, establish confidentiality awareness, and set the confidentiality work principle as the red line to prevent leakage of secrets. In addition, we should adhere to the principle of real-time effectiveness. Some requirements are highly time sensitive. Fast and real-time are the basic requirements for response speed. In case of emergency, we should not only handle the relationship between primary and secondary work, but also actively coordinate and communicate to ensure that important and urgent work tasks are met first, and other work contents are reasonably arranged.

Second, grasp the process control and do a good job of rigid constraints

Through early publicity and implementation with all branches and project departments, we insist that every contract document we have obtained has a process to follow. Through process management and control, we can promote the early discovery, early warning, early rectification and early effectiveness of problems, avoid the "human relationship seal" and "relationship seal", prevent minor defects from becoming a major hidden danger, promote the continuous improvement of process standardization, and achieve multi win.

Third, we should respect our duties and establish a sense of service

We should be in awe of our posts, our seals, and the interests of the company. We should clearly understand that everything we do is for the smooth progress of our work; Strengthen the sense of service, deeply love their own work, be good at comparing their feelings, think from the perspective of the person who handles the affairs, think about what the other person thinks, and be anxious about what the other person thinks.

In a word, with the development of the Group's new situation, our staff in charge of seal management should timely understand the work process of each department, constantly adapt to new situations and new situations, timely adjust and update the seal use specifications, constantly grow and improve their business ability to handle complex situations in service, and become a qualified safety initiator. (Gu Xiaolei of Suzhou Company)

Recommended news


Integrating into Six Networks to Build New Infrastructure | The Group was invited to attend the Jiangsu Province Conference on Promoting Construction Enterprises’ Participation in the Investment, Construction, and Operation of the “Six Networks” and on Government-Bank-Enterprise Coordination

On November 12, Jiangsu Province hosted a conference in Nanjing to promote the participation of construction enterprises in the investment, construction, and operation of the “Six Networks” initiative, as well as to facilitate connections among government, banks, and enterprises. Ma Shiguang, Vice Governor of Jiangsu Province, attended the meeting and delivered a speech. Tan Ying, Director of the Jiangsu Provincial Department of Housing and Urban–Rural Development, presented an overview of the development of Jiangsu’s construction industry and explained relevant policies. Zhang Jian, General Manager of the Group, also took part in the event.


The Group Company has successfully completed the administrative licensing approval for the comprehensive working hour calculation system.

In early November, the Group successfully passed the on-site verification for the administrative license renewal of its biennial comprehensive working-hour system, completing the new approval process. This has further standardized workforce management, reinforced compliance safeguards, balanced corporate development with employee rights, and strengthened employment security to support the Group’s resilient and sustainable growth.


Qidong City Held the Second Session of Its 2026 Entrepreneurs’ Symposium; Chairman Yin Weidong Attended and Delivered a Speech

On the afternoon of November 2, Qidong City held the second session of its 2026 Entrepreneurs’ Symposium. Cao Yanhui, Secretary of the Municipal Party Committee, attended and addressed the meeting; Qin Guangrong, Deputy Secretary of the Municipal Party Committee and Mayor, presided over the event; and municipal leaders Wang Yubing, Guo Jian, Song Haihua, among others, also took part.


The Group has been awarded two provincial-level construction methods in the Tibet Autonomous Region.

At the end of October, the Construction Industry Association of the Tibet Autonomous Region announced the list of regional-level construction methods for 2026. Two methods submitted by the Group—“Construction Method for Temporary Site Drainage Channels Using Prefabricated Polymer Materials” and “Spatial Dimension Measurement Method for Unit Acceptance Based on Total Stations”—were successfully selected.


Two projects of the Group have been awarded the Urumqi and Bazhou Quality Engineering Awards.

In mid-October, two Xinjiang projects under the Group were successively awarded the “2026 Urumqi Quality Project” and the “2026 Bazhou Quality Project,” reflecting the high recognition from the local industry authorities in both regions for the projects’ construction quality, safety management, and civilized site practices.


Two QC achievements of the Group have been awarded as First-Class Awards in Shanghai’s engineering construction sector.

Recently, two QC achievements submitted by the Group—“Improving the First‑Pass Yield of Concrete Surface Finishing” (Maosheng International Engineering Branch) and “Enhancing Sound Insulation and Noise Reduction in Serviced Apartment Rooms” (Jinrun Branch)—were recognized as Class I awards at the 2026 Shanghai Municipal Engineering Construction QC Group Awards.