Notice of comprehensive inspection in the second half of 2015
Regional companies, branch offices, project department:
In order to carry out the company quality safety management policy, the implementation of the Ministry of housing two years special operations requirements and company annual work conference to strengthen governance implementation, rectification supervision requirements, real-time grasp the regional branch, Department of the project quality and safety management and market supervision of the year live, technology, economy and safety and quality objectives. In accordance with the annual work plan of the group, we have decided to begin the comprehensive inspection of quality, safety, technology and market conduct in the second half of the year from November 3rd, and hereby notify the relevant items as follows:
I. inspection team personnel
Leader: Lu Fei
Deputy head: Wu Donghui
Chen Danbo, Lu Weihong, Gu Yong, Shen Jiansheng
Two, check the content
1, project safety, quality, technical excellence, security objectives and specific plans for deployment and implementation;
2, the project department rules and regulations to establish, implement and implement the situation;
3, project managers to configure compliance, to perform their duties;
4, the project technological innovation, four new technology, ten new technologies, green construction technology applications;
5, the project construction organization design, the specific program targeted, compliance;
6, engineering data synchronization, integrity, compliance; special equipment (pressure piping) notification, inspection procedures;
7, engineering physical perception and measured quality;
8, the project site VI set compliance, safety and civilized construction management, equipment management;
9, labor services, materials, equipment supply and other related parties contracts, wages paid, the compliance of funds transactions;
10 、 daily supervision and effectiveness evaluation of regional company and project department.
Three, inspection basis
1, the current national standard and professional GB50300, JGJ59 code for acceptance of construction quality, the Ministry of housing and the provincial housing department about two years management action plan documents, company safety, quality, market conduct comprehensive inspection tables.
2, check the score according to the evaluation results, according to excellent (100-90); good (89.9-80), (79.9-70), (69.9-60) rank checked project, ranking results will be through the company's newspapers, websites and file form to be published and linked to the year-end assessment.
Four, check arrangements
From the regional group existing in the construction project from a certain scale and representative projects, two consecutive inspection was not included in the branch project last year and the first half of the ranking is the inspection appraisal branch, project department. Check the schedule of the items and schedules. If the time is changed, the inspection team will inform the regional company and branch office ahead of time.
The regional companies will inform the relevant branch and project department in time, and prepare the preparation before the inspection according to the requirements of the group company.
Inspection team contact: Lu Weihong; Tel: 13073268666; mailbox: whlu@qaqa.com.cn;
Five, check procedures
1, listen to the daily management of regional initiatives the company branch, project department, technology innovation, excellence security summary report, focus on quality, safety management, self rectification effect, according to the special requirements of corporate governance report.
2, listen to the project department on-site report, report the use of PPT mode, need to focus on, time control in 15 minutes. Contents include:
(1) general situation of the project;
(2) engineering difficulties, characteristics and targeted technical solutions;
(3) the goal of project management and implementation of security planning excellence;
(4) application of new technology and innovation of technology and process;
(5) engineering quality management measures, HSE management measures and process control, green construction management;
(6) management of engineering data;
(7) the effect of the project and the present award;
(8) project market behavior: including project department personnel to witness one, subcontracting, personnel to perform their duties duty, contract payments, management of labor resources, labor subcontracting, customer satisfaction etc..
3, on-site inspection of the actual quality of the project and the actual situation of HSE.
4, engineering quality, HSE management data inspection.
5, the project market conduct inspection: including project personnel performance, subcontracting management, labor management, contract management, cash payment and so on.
6, the inspection team to the inspection of the project summary, itemized points, exchange of rectification and improvement projects and the project department, issued a rectification list, and the host branch, the regional company confirmation, follow up.
Six, inspection requirements
1, the regional company and project department in accordance with the content of the inspection and inspection procedures arranged by the relevant personnel, ready to check materials and inspection equipment required to cooperate with the inspection;
2, during the inspection should be normal construction, should not stop for inspection;
3, inspection reception to simple, as far as possible arranged in staff canteen dining. Do not drink at noon, and during the period of inspection, you should not accept gifts or red packets from the units under inspection. Please ask the units to abide by them.
Seven. Check the plan arrangement
Check the schedule of the items and schedules (the second half of the year 2015).
Jiangsu Kai an Construction Group Co., Ltd.
Two, 0, 15, October 29th