What problems can BIM help the project manager solve?


  What problems can BIM help the project manager solve?
In the construction phase, what are the advantages of the application of BIM to the project manager? BIM technology can help project managers solve many problems through data support, technical support and cooperative support.
Raise bid rate
Through the BIM system construction scheme more reasonable and more dazzling effect, show the powerful visualization scheme, precise engineering quantity and cost, can improve the competitiveness of a bid, improve the successful rate, a considerable number of enterprises and projects using BIM technology to enhance the competitiveness of the bid, the case has numerous. Bidding does not use BIM technology, it is a backward group.
Project planning
The project won the bid, how to better implement, in order to obtain the maximum benefit, control the time limit, guarantee the quality and safety, the project department will carry on the project plan, formulate the implementation goal. How to do a better job of project planning, make good use of BIM technology, no doubt can make the project planning ability substantially improved.
Support the use of BIM data, establish a cost plan, purchasing plan, financial planning, material planning, personnel week plan, support the use of BIM technology, making the cost more reasonable and more reasonable project construction plan, find the technical difficulties, construction difficulties, security risks.
Upgrading process planning control capability
The powerful data capabilities of the BIM system can help project managers take control of plans and anticipate resource requirements and output goals for subsequent progress.
Raise funds to pay the ability to control, prevent suppliers, subcontractors overestimate risk.
The project process involves a large amount of payment decisions, including payment audits by suppliers and subcontractors. The traditional management ability of project managers in this area is rather difficult. How much should I pay and why do I pay so much? See the following operation layer submitted bill payment, do not have the ability to audit, repeated hesitation, difficult decision, both consume a lot of energy and time judgment, but not accurate conclusion. If you have problems with the operating layer, it's hard to see and even be overhead, not a real project owner.
Prevent flying list
The supplier to fly alone in state-owned enterprises, private enterprises, a large number of projects generally exist, is a profit the biggest flaw, although often use video surveillance, said loadometer management means the project, an ultimate method is short period two or even three is compared, and the actual budget comparison consumption, can often be exposed, but also achieve total control of material consumption.
The traditional management tools can not be done in time, short cycle of the three calculation contrast, a large number of management vulnerabilities can not be found in a timely manner, BIM technology in this area has a strong real-time data supply capabilities.
Control duration
The use of BIM technology, through accurate positioning function, collision check, check, clean the reserved hole fast resource calculation and visualization tests and other functions, help the project timely find out various professional conflicts, reduce rework, rapid and collaborative construction, to speed up the construction period.
Reduce security risks
The use of BIM technology, timely identification of risk sources, program simulation, visual security disclosure and other applications to enhance project safety control capabilities.
Substantially increase profits and reduce costs
Focus on the construction phase of the BIM solutions, to help project managers calmly command and control production, significantly improve the level of fine management, reduce costs and achieve a full range of receivables, a substantial increase in profits.
Lower one's demands
The project is becoming more and more complex, and the amount of data is getting larger and larger. The number of managers and technicians can not keep up with the demand of the business. BIM technology helps every position and all kinds of complex operations to improve work efficiency and quality, and reduces the demand for people.
Enhance coordination ability
Based on cloud computing, the collaboration of the Internet is realized, and the remote and efficient collaboration is reduced and cooperative errors are reduced. Project managers conduct management decisions from remote verification of data, and project personnel use unified, accurate model data and visual communication to achieve efficient project communication.
Control more projects
Based on these capabilities, project managers are able to control more projects and manage more difficult projects.
Reduce your workload and make yourself more relaxed
For project managers, the work pressure, workload, with project level BIM system, you can reduce more work, so that you can more easily manage the project, improve quality of life. (source: China Construction Enterprise Management Association net)

Recommended news


Empowering Communities Through Health: Experts Bring Science-Based Education to Qian’an

On September 18, Jiangsu Qian’an Construction Group, in collaboration with the Science Education Base of Qidong People’s Hospital, hosted the 2026 National Science Popularization Event.


Benchmarking against global standards! The Jotun Zhangjiagang project has successfully passed the safety audit conducted by its Norwegian headquarters.

In mid-September, a foreign‑owned expert audit team from Jotun’s Norwegian headquarters conducted a three‑day, headquarter‑level specialized safety audit on the Jotun Zhangjiagang project site undertaken by the Group.


The Roche (Shanghai) project of the Group has successfully achieved 2 million safe man-hours.

On September 17, the Roche (Shanghai) Biopharmaceutical Production Base project, undertaken by the Group, successfully reached the milestone of 2 million safe man-hours.


The Group dispatched personnel to attend the training on building trustworthy quality teams in chemical engineering construction.

On September 16–17, the China Chemical Construction Enterprises Association held a training course on building “Quality‑Trusted Work Teams” in Chengdu, with representatives from the Group in attendance. The session featured a live lecture by Shi Jie, a senior expert of the Association.


Good News Abounds | The Group Has Secured Multiple Emerging Industry Projects in Succession

In the golden autumn season, bountiful harvests abound, and new‑generation growth sectors showcase their strength. Since August, leveraging its deep-rooted expertise and core competencies in industrial installation, the Group has successively won bids for five key projects in emerging productivity fields, with a total contract value exceeding RMB 250 million, injecting robust momentum into its resilient year‑end performance.


Two QC achievements of the Group have been awarded at the National Engineering Construction Quality Management Achievement Competition.

Recently, the China Construction Industry Association announced the results of the 2026 Engineering Construction Quality Management Team Achievement Competition. Two QC projects submitted by the Group—“Improving the First-Pass Acceptance Rate for One-Time Forming of Exterior Concrete Moldings” and “Enhancing the First-Pass Welding Acceptance Rate for Dissimilar Steels”—were awarded second and third prizes, respectively.