Key points of management and inspection of tower crane
Release time:
2021-09-02
Key points of management and inspection of tower crane
1、 Classification of tower crane: 1. According to the structural form, it is divided into fixed tower crane and mobile tower crane; 2. According to the form of self lifting, it is divided into: attached tower crane and internal climbing tower crane; 3. According to the slewing form, it is divided into: upper slewing tower crane and lower slewing tower crane; 4. It is divided into trolley luffing tower crane, boom luffing tower crane and folding boom tower crane according to luffing mode; 5. According to the form of tower cap, it is divided into hammer tower crane and flat head tower crane.
2、 The meaning of specific models and letters;
3、 Management requirements for equipment service life and configuration selection; 1. National requirements; 2. Company requirements.
4、 Safety responsibilities of the general contractor (Project Department of the company); 1. Provide basic data and construction conditions; 2. Audit qualification; 3. Process declaration; 4. Prepare various plans; 5。 Sign the lease contract; 6. Safety technical disclosure.
5、 Mobilization acceptance and regular inspection of tower crane: 1. Physical acceptance of tower crane; 2. Equipment license inspection; 3. Regular inspection.
6、 Management during the use of tower crane: 1. Regular maintenance; 2. Verticality detection; 3. Foundation settlement observation; 4. External power protection.
7、 Main safety devices of tower crane: 1. Torque limiter; 2. Lifting capacity limiter; 3. Height limiter; 4. Luffing limiter; 5. Rotary stopper; 6. Drum insurance (anti falling insurance of each steel wire rope); 7. Trolley broken shaft and rope fuse; 8. Hook safety.
8、 Key points for physical safety inspection of tower crane; 1. Foundation part; 2. Anti climbing measures for tower crane; 3. Key points of tower body inspection; 4. Key points of attachment and anchorage inspection; 5. Key points of jacking jacket inspection; 6. Key points for inspection of slewing mechanism; 7. Key points of cab inspection; 8. Key points of safety protection device inspection; 9. Inspection of boom, balance arm, tower cap, pull rod, etc.
Strengthening the management of large-scale equipment can effectively prevent and reduce the occurrence of safety accidents of various large-scale equipment and realize safe production. (Installation Department)
Recommended news
2026-06-25
On the morning of June 25, the grand opening ceremony of Quake Haofudun Materials Technology (Suzhou) Co., Ltd. was held in the Zhangjiagang Free Trade Zone. Zhang Jian, General Manager of the Group, along with Deputy General Manager Shi Saicai and other invited guests, attended the event and jointly witnessed this significant milestone marking the project’s entry into production.
2026-06-24
Recently, the preliminary-round results of the province-wide construction‑site safety production knowledge competition were officially announced. The Group achieved an outstanding team performance, with six participants ranking in the top ten, placing first among all construction enterprises in the province.
2026-06-22
In mid-June, the Roche Pharmaceuticals project, constructed by the Group’s Maosheng International Engineering Branch, successfully completed the indoor relocation of three 13-ton heavy-duty pieces of equipment within a high‑standard epoxy flooring area, utilizing an air‑suspension cushion‑lifting technique.
2026-06-10
On June 2, the “Carrying Forward the Glory of Military Service, Ensuring the Well-being of Veteran Soldiers” Care Foundation was officially established at the Qidong Municipal Bureau of Veterans Affairs and the Municipal Charity Federation, under the leadership of Gong Shancong, Deputy General Manager of the Group. The foundation aims to “show care for veterans, alleviate their difficulties, safeguard their health and well-being, and spread warmth throughout society.”
2026-06-05
The Group’s Roche Pharmaceutical Project has been awarded the One-Million-Safety-Hours Award.
On June 5, the Roche (Shanghai) Biopharmaceutical Production Base Project (Phase I) held a ceremony to celebrate reaching one million safe man-hours, and the Group was presented with a commemorative trophy.
2026-05-26
The Group convened a special meeting of the dedicated task force for major project services.
On the afternoon of May 25, the Group convened a special working meeting on major project services in the 16th-floor conference room, with senior management and all members of the Major Project Management Department in attendance. The meeting was chaired by Zhang Jian, General Manager of the Group.