Chairman Yin Weidong was invited to attend the opening ceremony of Nantong Rail Transit Line 1


Chairman Yin Weidong was invited to attend the opening ceremony of Nantong Rail Transit Line 1

Nantong is accessible and everything is renewed; Nantong Rail, I am Qi'an. At 7:00 a.m. on November 10, the opening ceremony of Nantong Rail Transit Line 1 participated by the Group Company was held at Entrance 4 of Grand Theater Station of Rail Transit Line 1. Yin Weidong, Secretary of the Party Committee and Chairman of the Board of Directors of the Group Company, was invited to participate in the opening ceremony as the representative of the participants. Wang Hui, secretary of Nantong Municipal Party Committee, announced that Rail Transit Line 1 was officially opened to traffic.

The total length of Nantong Rail Transit Line 1 is 39.182 km. The whole line is composed of underground lines and underground stations. One Pingdong Depot and one Xiaohai Parking Station are set up, which is the largest and most complex infrastructure project in Nantong's urban construction history. In January 2020, the Group Company successfully won the bid for Lot 04 of Electromechanical Installation of Line 1 Phase I Project, which is the first to cooperate with "Chinese character" enterprises in the construction of rail transit, and is mainly responsible for the construction of power and lighting systems, ventilation and air conditioning systems, water supply and drainage systems, etc. of four stations including Huanxi Cultural Plaza Station and the adjacent half distance sections of each station. This is the most difficult, most urgent and demanding section of the project. During the construction period of more than two years, the group and company in charge of construction overcame many difficulties such as tight construction period, heavy tasks, multiple cross construction, heavy coordination workload, epidemic situation and high temperature, gave full play to the spirit and professional advantages of the Qi'an Railway Army, which is particularly capable of fighting, fulfilled the high expectations and completed the construction task with great care, and was praised and affirmed by the owner many times, so as to open a new prelude to Nantong's urban construction It has made outstanding contributions to Nantong traffic construction and accumulated construction experience for the Group to participate in urban rail transit construction. Wu Xinming, Deputy Secretary of Nantong Municipal Party Committee and Mayor, expressed his sincere thanks to all the builders, including Qi'an in Jiangsu, in his speech. After the opening ceremony, Yin Weidong and the leaders of Nantong also took the subway together to experience the operation of Nantong Rail Transit Line 1.

Gu Bin, the head of the subsidiary company of the Group, Cai Boat, the head of Nantong Company, and all the management personnel of the Project Department attended the opening ceremony together. (Nantong Company)

Recommended news


The Group dispatched representatives to attend the Exchange Meeting on Construction Project Quality and Safety Management and the On-site Observation Session.

In late September, the China Construction Enterprise Management Association organized an experience-sharing and on-site observation conference on quality and safety management in construction projects in Guangzhou, which was attended by representatives from the Group.


Empowering Communities Through Health: Experts Bring Science-Based Education to Qian’an

On September 18, Jiangsu Qian’an Construction Group, in collaboration with the Science Education Base of Qidong People’s Hospital, hosted the 2026 National Science Popularization Event.


Benchmarking against global standards! The Jotun Zhangjiagang project has successfully passed the safety audit conducted by its Norwegian headquarters.

In mid-September, a foreign‑owned expert audit team from Jotun’s Norwegian headquarters conducted a three‑day, headquarter‑level specialized safety audit on the Jotun Zhangjiagang project site undertaken by the Group.


The Roche (Shanghai) project of the Group has successfully achieved 2 million safe man-hours.

On September 17, the Roche (Shanghai) Biopharmaceutical Production Base project, undertaken by the Group, successfully reached the milestone of 2 million safe man-hours.


The Group dispatched personnel to attend the training on building trustworthy quality teams in chemical engineering construction.

On September 16–17, the China Chemical Construction Enterprises Association held a training course on building “Quality‑Trusted Work Teams” in Chengdu, with representatives from the Group in attendance. The session featured a live lecture by Shi Jie, a senior expert of the Association.


Good News Abounds | The Group Has Secured Multiple Emerging Industry Projects in Succession

In the golden autumn season, bountiful harvests abound, and new‑generation growth sectors showcase their strength. Since August, leveraging its deep-rooted expertise and core competencies in industrial installation, the Group has successively won bids for five key projects in emerging productivity fields, with a total contract value exceeding RMB 250 million, injecting robust momentum into its resilient year‑end performance.