Jiangsu standard remote bid evaluation
Release time:
2017-07-01
Jiangsu standard remote bid evaluation
A few days ago, the Jiangsu Provincial Construction Project Bidding Office issued a notice to clarify the relevant work requirements for remote remote bid evaluation to ensure the smooth implementation of the new remote bid evaluation.
According to the notice, local bidding offices should strictly check when handling the filing, and it is forbidden to use the comprehensive evaluation method to evaluate bids for non-large and above projects or projects with more complex technologies. At the same time, it is necessary to do a good job in the cooperation and management of remote bid evaluation. Each trading center shall set up an access control system for the bid evaluation area. Conditional trading centers shall set up duty rooms in the bid evaluation area and install recorded telephones to ensure instant contact for remote bid evaluation.
The notice pointed out that Jiangsu Province will actively implement the technical bid dark bid evaluation system in remote bid evaluation to ensure that bid evaluation activities are objective and fair. All localities shall adjust the bidding document template and specify the requirements for the hidden mark of the technical bid (such as font, font size, number of lines per page, etc.). In the second half of the year, in principle, all technical bids for remote bid evaluation in Jiangsu province will be evaluated by dark bids.
At the same time, the notice stipulates that remote bid evaluation in different places should be arranged every morning, and the bid evaluation experts should be uniformly selected as the morning of the previous day, and the remote bid evaluation experts on Monday morning can be selected on Friday morning. No remote bid evaluation will be arranged on the first day after the festival (legal festival). If it is necessary to make up the bid evaluation experts on the day of bid evaluation due to avoidance and other reasons, the remote bid evaluation experts who can not participate in the bid evaluation on the same day shall not be included in the assessment. For electronic bidding and remote bid evaluation, bid evaluation experts must log into the electronic bid evaluation system with CA lock for bid evaluation. those without CA lock will not be extracted, and bid evaluation cannot be carried out without CA lock.
It is also reported that the Jiangsu Provincial Construction Project Tendering and Bidding Office has decided that after July 1, Jiangsu Province will uniformly use the bid-winning notice with two-dimensional codes. (From Jiangsu Construction Industry)
next page
Recommended news
2026-09-21
Empowering Communities Through Health: Experts Bring Science-Based Education to Qian’an
On September 18, Jiangsu Qian’an Construction Group, in collaboration with the Science Education Base of Qidong People’s Hospital, hosted the 2026 National Science Popularization Event.
2026-09-18
In mid-September, a foreign‑owned expert audit team from Jotun’s Norwegian headquarters conducted a three‑day, headquarter‑level specialized safety audit on the Jotun Zhangjiagang project site undertaken by the Group.
2026-09-18
The Roche (Shanghai) project of the Group has successfully achieved 2 million safe man-hours.
On September 17, the Roche (Shanghai) Biopharmaceutical Production Base project, undertaken by the Group, successfully reached the milestone of 2 million safe man-hours.
2026-09-18
On September 16–17, the China Chemical Construction Enterprises Association held a training course on building “Quality‑Trusted Work Teams” in Chengdu, with representatives from the Group in attendance. The session featured a live lecture by Shi Jie, a senior expert of the Association.
2026-09-09
Good News Abounds | The Group Has Secured Multiple Emerging Industry Projects in Succession
In the golden autumn season, bountiful harvests abound, and new‑generation growth sectors showcase their strength. Since August, leveraging its deep-rooted expertise and core competencies in industrial installation, the Group has successively won bids for five key projects in emerging productivity fields, with a total contract value exceeding RMB 250 million, injecting robust momentum into its resilient year‑end performance.
2026-09-03
Recently, the China Construction Industry Association announced the results of the 2026 Engineering Construction Quality Management Team Achievement Competition. Two QC projects submitted by the Group—“Improving the First-Pass Acceptance Rate for One-Time Forming of Exterior Concrete Moldings” and “Enhancing the First-Pass Welding Acceptance Rate for Dissimilar Steels”—were awarded second and third prizes, respectively.