Nantong company organized and held an emergency meeting on closed-loop management of Qidong projects under construction
Release time:
2022-03-18
Nantong company organized and held an emergency meeting on closed-loop management of Qidong projects under construction
On the afternoon of March 17, Nantong group organized the head of Qidong project under construction department to hold an emergency meeting to comprehensively strengthen the closed-loop management of epidemic prevention and control. Cai Chuan, the regional leader, conveyed the relevant notice of Qidong housing and Urban Rural Development Bureau, requiring all project departments to coordinate the work related to the closed-loop management of the epidemic situation on the construction site, conduct a comprehensive inspection in strict accordance with the guidelines for normalized prevention and control on the construction site, and carefully investigate the working system, personnel management, on-site management, emergency management and supervision management in detail; Strictly implement the epidemic prevention and control measures on the construction site, continue to strengthen the promotion of vaccination, reserve epidemic prevention materials, and strictly control the entry and exit of personnel, accommodation, dining, closed management and real name system management; Comprehensively strengthen the "closed-loop management" of the construction site under construction, do a good job in the nucleic acid detection of all staff on the construction site, issue the "two points and one line" commitment, and firmly seal the construction site; Do a good job in the management of all construction personnel in detail, verify the health information, and do not recruit or hire arbitrarily; Ensure that the epidemic prevention and control management system of built-in projects in Nantong region operates scientifically and efficiently. (Zhang Kailei)
Recommended news
2026-11-18
The Group Company has completed the renewal of its Class B boiler installation license.
On November 16, with approval from the Jiangsu Provincial Administration for Market Regulation, the Group successfully completed the renewal of its Class B boiler installation license, bearing certificate number TS3132068-2031, valid until January 7, 2031.
2026-11-16
On November 12, Jiangsu Province hosted a conference in Nanjing to promote the participation of construction enterprises in the investment, construction, and operation of the “Six Networks” initiative, as well as to facilitate connections among government, banks, and enterprises. Ma Shiguang, Vice Governor of Jiangsu Province, attended the meeting and delivered a speech. Tan Ying, Director of the Jiangsu Provincial Department of Housing and Urban–Rural Development, presented an overview of the development of Jiangsu’s construction industry and explained relevant policies. Zhang Jian, General Manager of the Group, also took part in the event.
2026-11-11
In early November, the Group successfully passed the on-site verification for the administrative license renewal of its biennial comprehensive working-hour system, completing the new approval process. This has further standardized workforce management, reinforced compliance safeguards, balanced corporate development with employee rights, and strengthened employment security to support the Group’s resilient and sustainable growth.
2026-11-03
On the afternoon of November 2, Qidong City held the second session of its 2026 Entrepreneurs’ Symposium. Cao Yanhui, Secretary of the Municipal Party Committee, attended and addressed the meeting; Qin Guangrong, Deputy Secretary of the Municipal Party Committee and Mayor, presided over the event; and municipal leaders Wang Yubing, Guo Jian, Song Haihua, among others, also took part.
2026-11-03
The Group has been awarded two provincial-level construction methods in the Tibet Autonomous Region.
At the end of October, the Construction Industry Association of the Tibet Autonomous Region announced the list of regional-level construction methods for 2026. Two methods submitted by the Group—“Construction Method for Temporary Site Drainage Channels Using Prefabricated Polymer Materials” and “Spatial Dimension Measurement Method for Unit Acceptance Based on Total Stations”—were successfully selected.
2026-10-27
Two projects of the Group have been awarded the Urumqi and Bazhou Quality Engineering Awards.
In mid-October, two Xinjiang projects under the Group were successively awarded the “2026 Urumqi Quality Project” and the “2026 Bazhou Quality Project,” reflecting the high recognition from the local industry authorities in both regions for the projects’ construction quality, safety management, and civilized site practices.