Nantong company organized and held an emergency meeting on closed-loop management of Qidong projects under construction
Release time:
2022-03-18
Nantong company organized and held an emergency meeting on closed-loop management of Qidong projects under construction
On the afternoon of March 17, Nantong group organized the head of Qidong project under construction department to hold an emergency meeting to comprehensively strengthen the closed-loop management of epidemic prevention and control. Cai Chuan, the regional leader, conveyed the relevant notice of Qidong housing and Urban Rural Development Bureau, requiring all project departments to coordinate the work related to the closed-loop management of the epidemic situation on the construction site, conduct a comprehensive inspection in strict accordance with the guidelines for normalized prevention and control on the construction site, and carefully investigate the working system, personnel management, on-site management, emergency management and supervision management in detail; Strictly implement the epidemic prevention and control measures on the construction site, continue to strengthen the promotion of vaccination, reserve epidemic prevention materials, and strictly control the entry and exit of personnel, accommodation, dining, closed management and real name system management; Comprehensively strengthen the "closed-loop management" of the construction site under construction, do a good job in the nucleic acid detection of all staff on the construction site, issue the "two points and one line" commitment, and firmly seal the construction site; Do a good job in the management of all construction personnel in detail, verify the health information, and do not recruit or hire arbitrarily; Ensure that the epidemic prevention and control management system of built-in projects in Nantong region operates scientifically and efficiently. (Zhang Kailei)
Recommended news
2026-06-05
The Group’s Roche Pharmaceutical Project has been awarded the One-Million-Safety-Hours Award.
On June 5, the Roche (Shanghai) Biopharmaceutical Production Base Project (Phase I) held a ceremony to celebrate reaching one million safe man-hours, and the Group was presented with a commemorative trophy.
2026-05-26
The Group convened a special meeting of the dedicated task force for major project services.
On the afternoon of May 25, the Group convened a special working meeting on major project services in the 16th-floor conference room, with senior management and all members of the Major Project Management Department in attendance. The meeting was chaired by Zhang Jian, General Manager of the Group.
2026-05-26
The Jinshun Branch of the Group organized a project management observation and exchange event.
On May 23, the Jinshun Branch of the Group organized an on-site observation and exchange session on project management. All project managers, frontline supervisors, and relevant personnel from various functional departments of the branch attended the event, while selected managers from China State Construction Engineering Corporation Third Bureau and Xinjiang Production and Construction Corps Construction Engineering Company were invited to participate in the observation and discussion.
2026-05-09
Group General Manager Zhang Jian Visits Asahi Kasei (Nantong) to Deepen Cooperation and Exchange
On May 8, Zhang Jian, General Manager of the Group, led a delegation to Asahi Kasei Fine Chemicals (Nantong) Co., Ltd. for a project follow-up visit and exchange meeting, during which they held a symposium with Asahi Kasei General Manager Yuichi Sanro and other senior executives. Cai Ting and Gao Mingmin, Deputy General Managers of the Group, also attended the event.
2026-05-21
Recently, good news emerged from the southern market: the Group has successfully won the bid for Fujian Yuanfu Technology Co., Ltd.’s 3,000-ton-per-year high-purity lithium fluoride project under an EPC general contracting model, with a total contract value exceeding RMB 40 million.
2026-05-19
In mid-May, the hotel renovation project for the Shanghai Wangyuan Building, undertaken by the Group, entered its final, critical phase of intensive completion. At present, all core construction tasks— including the main interior finishing works and the installation and commissioning of various mechanical and electrical systems—have been successfully completed. The project’s focus has now fully shifted to meticulous fine‑tuning, integrated system testing and commissioning, and comprehensive on‑site cleanup and final finishing.