Shaanqi Heavy Truck and Cummins Project (Mechanical and Electrical Installation) Construction Experience Sharing


1. After winning the bid for the project, the electrical construction workers should deepen the drawings and not blindly follow the direction of the drawings; The specifications and sizes of cables and cable trays shall be improved to meet the use standards and specifications.

2. During the bridge construction, it was found that the three-way reducing elbow of the bridge was purchased as finished parts. It is suggested to cancel the supply of finished products for the next project and let the construction team make them according to the actual situation on site.

3. The piping of the air conditioner valve group in the general assembly workshop is fabricated and installed on site. It is suggested that the next project can be prefabricated in the processing plant, and only needs to be bolted to the site.

4. On the site of electrical lighting piping in the general assembly workshop, the piping shall be completed before threading. It is suggested that piping and threading can be carried out simultaneously in the next project to save manpower and material resources.

5. All pumps and valve groups in the complex station can be prefabricated in the processing yard, and only need to be installed on site.

6. Too little glue was brushed during the thermal insulation construction in the general assembly workshop, which resulted in internal water accumulation due to long-term temperature difference. It is suggested to carry out relevant work disclosure before the construction of the next project.

7. The wages of subcontracting teams must be paid first to the workers and then to the subcontracting boss.

8. In terms of the use of machinery, it is recommended to calculate the machinery cost and send it to the subcontracting teams for their own control to avoid waste in the use of machinery.

9. For threaded copper valves below DN50, special open-end wrenches must be used, and pipe wrenches and other tools are not allowed.

10. Specify some construction details in advance, such as the scope of finished tee of welded steel pipe, the connection mode of pipe, the type of support, etc. It is better to set a sample section in advance to avoid material and labor losses.

11. Before the installation of the pipe support, the spacing of the pipe and the reducing position of the pipe must be clear to avoid the drilling of the support in the later period.

12. The biggest impact on future projects: modular hoisting shall be adopted as far as possible, and the site shall be easy to process and assemble. See the attached figure for details.

Recommended news


The Group Company has completed the renewal of its Class B boiler installation license.

On November 16, with approval from the Jiangsu Provincial Administration for Market Regulation, the Group successfully completed the renewal of its Class B boiler installation license, bearing certificate number TS3132068-2031, valid until January 7, 2031.


Integrating into Six Networks to Build New Infrastructure | The Group was invited to attend the Jiangsu Province Conference on Promoting Construction Enterprises’ Participation in the Investment, Construction, and Operation of the “Six Networks” and on Government-Bank-Enterprise Coordination

On November 12, Jiangsu Province hosted a conference in Nanjing to promote the participation of construction enterprises in the investment, construction, and operation of the “Six Networks” initiative, as well as to facilitate connections among government, banks, and enterprises. Ma Shiguang, Vice Governor of Jiangsu Province, attended the meeting and delivered a speech. Tan Ying, Director of the Jiangsu Provincial Department of Housing and Urban–Rural Development, presented an overview of the development of Jiangsu’s construction industry and explained relevant policies. Zhang Jian, General Manager of the Group, also took part in the event.


The Group Company has successfully completed the administrative licensing approval for the comprehensive working hour calculation system.

In early November, the Group successfully passed the on-site verification for the administrative license renewal of its biennial comprehensive working-hour system, completing the new approval process. This has further standardized workforce management, reinforced compliance safeguards, balanced corporate development with employee rights, and strengthened employment security to support the Group’s resilient and sustainable growth.


Qidong City Held the Second Session of Its 2026 Entrepreneurs’ Symposium; Chairman Yin Weidong Attended and Delivered a Speech

On the afternoon of November 2, Qidong City held the second session of its 2026 Entrepreneurs’ Symposium. Cao Yanhui, Secretary of the Municipal Party Committee, attended and addressed the meeting; Qin Guangrong, Deputy Secretary of the Municipal Party Committee and Mayor, presided over the event; and municipal leaders Wang Yubing, Guo Jian, Song Haihua, among others, also took part.


The Group has been awarded two provincial-level construction methods in the Tibet Autonomous Region.

At the end of October, the Construction Industry Association of the Tibet Autonomous Region announced the list of regional-level construction methods for 2026. Two methods submitted by the Group—“Construction Method for Temporary Site Drainage Channels Using Prefabricated Polymer Materials” and “Spatial Dimension Measurement Method for Unit Acceptance Based on Total Stations”—were successfully selected.


Two projects of the Group have been awarded the Urumqi and Bazhou Quality Engineering Awards.

In mid-October, two Xinjiang projects under the Group were successively awarded the “2026 Urumqi Quality Project” and the “2026 Bazhou Quality Project,” reflecting the high recognition from the local industry authorities in both regions for the projects’ construction quality, safety management, and civilized site practices.