Health post station project duty diary
Release time:
2022-04-12
Health post station project duty diary
On the evening of Friday, April 8, the moon is bright and the stars are sparse
The construction site is as bright as day, and the red flag of the "vanguard of Party members" at the gate is hunting. The main work tonight is the pouring of the bottom plate of the rainwater collection tank, the pouring of the top plate of the garbage room, the excavation of the sewage tank and the precipitation at the bottom.
The personnel on duty of the project have been patrolling the construction site. The lighting on the site is sufficient, the bottom plate of the rainwater collection tank has been poured, and the dewatering pump on the side works well; The foundation pit of sewage tank is being excavated; About 30 people were binding reinforcement on the roof slab of the garbage house, and the support bent was checked. There was a lack of sweeping rod, cross bar and inclined support. The woodworking team was immediately required to make rectification.
20: 00, a worker wearing a hard hat and a pair of rubber shoes walked past the gate of the construction site, swearing: "I have been working since 11:00 noon, and I can't eat meals (there's no boxed lunch). I've worked overtime with a hammer, and I quit!"
20: 30. The pouring of the bottom plate of the rainwater pool is completed. The reinforcement bent of the carpentry team in the garbage room has been connected, and the sweeping rod, cross bar and cross bridging have been set in place. After work, the carpentry team chatted with them all the way to the parking point and learned that they all lived in Hefeng and JuYang. Due to the epidemic control, they walked more than ten miles from the "five head water leak (place name)", got home at 2:30 a.m. and arrived at the construction site at 6:30 a.m. Four night shifts have been added in a row.
"How about overtime pay?"
"I didn't ask. The project is important. Grab the work first."
"Can you bear it?"
"OK."
I nodded and told them to be careful on the way.
At 21:30, the garbage room was ready to cast the roof, and the support bent was checked and accepted together with the supervisor. I saw that the abusive worker was on site again.
"Have you eaten?"
"No, after eating a bucket of instant noodles, put a cushion first, and the lunch box boss went to get it."
"Didn't you stop working overtime today?" Asked half jokingly.
"That's angry. I can't work overtime. The project is so tight that it will affect the one-day construction period. I can distinguish the severity."
Just then, the boss took more than 10 boxed meals and asked the workers to eat. It turned out that in order to grab the top plate reinforcement binding, more than 10 reinforcement workers came at night, and there were fewer boxed meals.
At 22:00, the carpenter began to cast the concrete carefully and carefully. When the pouring was almost finished, he came down from the shelf and I went to his side.
"Why did you come back from work?"
"As soon as I ran to the door, the boss called me and asked me to help. He said that I lived at the small gate. I was closest to the project. I worked hard and left to see the mold. I moved the faucet and came back. Life must fall first." The voice is obviously a little hoarse
I wanted to take a picture of him to record the ordinary people's feelings. When I went back to him, the foreman told me that he had just left. I think today's nodes are all robbed. He can get up later and have a good sleep tomorrow.
At 22:30, the excavation of the sewage tank was coming to an end, and the workers on the edge were preparing for the precipitation.
"When did you come?"
"It will arrive at 8 o'clock."
"I've been waiting for three hours."
"No way, we can't finish it today, and we can't pour the bottom plate tomorrow, which will affect the construction period."
At 23:00, the excavator master took the initiative to chat with me after getting off the machine. His eyes were a little puffy and lacked sleep.
"Have you been working overtime for a long time?"
"Night shift for a week in a row."
"Go back to bed early today."
"I live in Xingang town. There is still more than an hour on the road. It is estimated that it will be 1 o'clock when I get home."
At 23:30, the dewatering cannula was completed, the pump began to operate and pumped out, and the electrician on duty patrolled the site.
"Are you on the night shift today?"
"It's a."
"When is it worth?"
"Dawn."
"Get it?"
"Ensure the normal operation of the dewatering pump and check it once an hour."
At the moment of fighting against the epidemic, pay tribute to everyone who silently pays for the Qidong health post station (peacetime and wartime combination) project. I wish the mountains and rivers are safe and the country is peaceful and the people are safe! (Lu Jianjian)

Recommended news
2026-11-18
The Group Company has completed the renewal of its Class B boiler installation license.
On November 16, with approval from the Jiangsu Provincial Administration for Market Regulation, the Group successfully completed the renewal of its Class B boiler installation license, bearing certificate number TS3132068-2031, valid until January 7, 2031.
2026-11-16
On November 12, Jiangsu Province hosted a conference in Nanjing to promote the participation of construction enterprises in the investment, construction, and operation of the “Six Networks” initiative, as well as to facilitate connections among government, banks, and enterprises. Ma Shiguang, Vice Governor of Jiangsu Province, attended the meeting and delivered a speech. Tan Ying, Director of the Jiangsu Provincial Department of Housing and Urban–Rural Development, presented an overview of the development of Jiangsu’s construction industry and explained relevant policies. Zhang Jian, General Manager of the Group, also took part in the event.
2026-11-11
In early November, the Group successfully passed the on-site verification for the administrative license renewal of its biennial comprehensive working-hour system, completing the new approval process. This has further standardized workforce management, reinforced compliance safeguards, balanced corporate development with employee rights, and strengthened employment security to support the Group’s resilient and sustainable growth.
2026-11-03
On the afternoon of November 2, Qidong City held the second session of its 2026 Entrepreneurs’ Symposium. Cao Yanhui, Secretary of the Municipal Party Committee, attended and addressed the meeting; Qin Guangrong, Deputy Secretary of the Municipal Party Committee and Mayor, presided over the event; and municipal leaders Wang Yubing, Guo Jian, Song Haihua, among others, also took part.
2026-11-03
The Group has been awarded two provincial-level construction methods in the Tibet Autonomous Region.
At the end of October, the Construction Industry Association of the Tibet Autonomous Region announced the list of regional-level construction methods for 2026. Two methods submitted by the Group—“Construction Method for Temporary Site Drainage Channels Using Prefabricated Polymer Materials” and “Spatial Dimension Measurement Method for Unit Acceptance Based on Total Stations”—were successfully selected.
2026-10-27
Two projects of the Group have been awarded the Urumqi and Bazhou Quality Engineering Awards.
In mid-October, two Xinjiang projects under the Group were successively awarded the “2026 Urumqi Quality Project” and the “2026 Bazhou Quality Project,” reflecting the high recognition from the local industry authorities in both regions for the projects’ construction quality, safety management, and civilized site practices.